Free tool · For garment manufacturers
Build a garment, get its SMV
Put the garment together part by part: neck, opening, sleeves, hem or waist, pockets and details. Every choice is drawn and priced in minutes, and the bulletin it makes is ready to change, balance and price.
The garment
each starts as it usually comesThe fabric
harder fabrics slow every machineIts parts
each shown on a typical garment; minutes against the one pickedNeck and collar
Opening
Sleeve length
Sleeve style
Sleeve end
Hem
Pockets
count each kind
Chest pocket+1.15 min each0
Patch pocket+0.79 min each0Details and trims
tap to addHow it is made
Fit
Seams
Sizes in the order · larger sizes have longer seams
Allowances and your floor
Minutes by part
With allowances: where this garment's time goes.
- Body3.86 min
- Opening3.68 min
- Neck and collar1.94 min
- Sleeve end1.15 min
- Sleeve style0.91 min
- Details0.73 min
- Hem0.61 min
Minutes by machine
The machines a line for it needs.
- Single-needle lockstitch5.94 min
- Overlock3.48 min
- Manual1.59 min
- Coverstitch0.61 min
- Iron and press0.55 min
- Buttonhole0.35 min
- Button sew0.35 min
What this tells you
- "Attach and close placket" is the heaviest operation (1.94 min): a better folder or attachment there saves the most.
- For 800 a day you need 36 operators at 60%; with 30 the line makes 671.
- These minutes are general starting points for an average factory. Replace each with your own time study (below) for a bulletin you can price on.
The operation bulletin
Made from your garment. Change any name, machine or minutes; changing the garment above builds it again.
| # | Operation | Part | Machine | SMV | Operators | |
|---|---|---|---|---|---|---|
| Parts preparation · 1.39 min | ||||||
| 1 | Body | 1 | ||||
| 2 | Opening | 3 | ||||
| 3 | Sleeve end | 1 | ||||
| Assembly · 7.10 min | ||||||
| 4 | Body | 1bottleneck | ||||
| 5 | Body | 3 | ||||
| 6 | Neck and collar | 4 | ||||
| 7 | Neck and collar | 2 | ||||
| 8 | Opening | 5bottleneck | ||||
| 9 | Sleeve style | 3 | ||||
| 10 | Sleeve end | 3 | ||||
| 11 | Hem | 2 | ||||
| 12 | Details | 2 | ||||
| Finishing and packing · 2.41 min | ||||||
| 13 | Body | 2 | ||||
| 14 | Body | 2 | ||||
| 15 | Body | 2 | ||||
| 16 | Body | 2 | ||||
| 17 | Opening | 1 | ||||
| 18 | Opening | 1 | ||||
Balance a line
Operators on each operation for a target an hour, and where the line is held.
| Operators | 40 |
| Line makes an hour | 93 |
| Balance | 80.4% |
| Held by | Join shoulders (93/h) |
From a time study
Time one operation over several cycles: readings far from the rest are set aside, the average levelled by your pace rating and given the allowances.
| Cycles kept | 7 |
| Set aside | 52 |
| Basic minutes | 0.645 |
| Standard minutes (+18%) | 0.76 |
Talk to us
Want this on your own styles and orders?
In WOVENN MAKEX each style keeps its bulletin with your own time studies, balances the line for the target, lays it out on the machines you have free, and tracks output by operation and operator, hour by hour.
We reply within one working day, starting from the figures you entered here.
In WOVENN MAKEX each style keeps its bulletin with your own time studies, and output is tracked by operation and operator.
Try WOVENN